India's First Greenfield Smart City — Airport, Semiconductor Hub & Port Incoming
Get Dholera Investment Brief
Saurabh calls back personally · Docs upfront · No pressure
Dholera Special Investment Region (SIR) is India's most ambitious infrastructure project — a 920 sq km planned city being built from scratch by the Gujarat Government and DMIC. The 6-lane expressway is operational, the dedicated power grid is active, and the airport runway is complete with calibration flights done. Tata Electronics is setting up a ₹91,000 Cr semiconductor fab 35 km away — the single largest private investment in Indian manufacturing history.
No call centres, no middlemen. One person — start to registry.
Reach Saurabh directly — no call centre, no junior agent. One conversation, all your questions answered honestly.
RERA, NA order, title chain, layout plan — all shared before any payment is requested. No surprise at registry.
Free site visit coordinated by Saurabh. See the land, the project, the connectivity. Zero pressure to buy.
Dholera Special Investment Region (SIR) is India's most ambitious infrastructure project — a 920 sq km planned city being built from scratch by the Gujarat Government and DMIC. The 6-lane expressway is operational, the dedicated power grid is active, and the airport runway is complete with calibration flights done (commercial operations expected December 2026). Tata Electronics is setting up a ₹91,000 Cr semiconductor fab — the single largest private investment in Indian manufacturing history.
Plot prices moved from ₹300/sq ft in 2021 to ₹1,050/sq ft in 2024 — that is 3.5× appreciation before the airport even opened. Investors who bought in 2021–22 have already seen 4× returns. Inside the Activation City (the first 22.5 sq km), current prices are ₹3,000–₹9,000/sq ft depending on sector and road-facing. The next major catalyst — commercial airport operations — could trigger the same step-change that the expressway inauguration did in 2023.
What is confirmed and on the ground: (1) ABCD Building — completed and inaugurated by PM Modi, (2) Dholera SIR Expressway — 6-lane, fully operational from Ahmedabad, (3) Dedicated power substation — grid live, (4) Airport runway — calibration complete, commercial ops December 2026, (5) Tata Electronics semiconductor fab — under construction 35 km away at Dholera SIR boundary, (6) Micron $825M chip assembly plant — announced and confirmed.
Investors with a 3–7 year horizon who want exposure to India's semiconductor and smart city build-out. Dholera is not a rental-yield play at current prices — it is a capital appreciation play. The buyers who win here are those who hold through the airport opening (2026) and the semiconductor supply-chain ramp-up (2027–2029). Every land price step-change in Dholera has been triggered by confirmed infrastructure milestones — not speculation. Airport operations will be the next milestone.
Each project personally verified by Saurabh — legal documents shared before any payment.
Real infrastructure milestones — confirmed, in progress, and upcoming
Key distances and transport links from Dholera
Saurabh shares all documents below before any payment is requested. If any document is missing or unclear, the project is not listed on this site.
The Dholera International Airport runway is complete and calibration flights are done. Commercial passenger operations are expected to begin in December 2026. This is the single most anticipated infrastructure milestone for Dholera plot investors.
Inside the Activation City (the first 22.5 sq km with operational infrastructure), DSIRDA-approved plots are currently priced at ₹3,000–₹9,000/sq ft depending on sector, road width, and proximity to the commercial spine. Contact Saurabh on WhatsApp for project-specific pricing.
Yes. Tata Electronics has officially confirmed a ₹91,000 Crore semiconductor fabrication plant investment — the largest private manufacturing investment in Indian history. The site is within Dholera SIR. Construction is underway. This is not an announcement — it is an active construction project.
Verify: (1) Gujarat RERA registration at gujrera.gov.in, (2) DSIRDA (Dholera SIR Development Authority) approval for the specific scheme, (3) TP (Town Planning) scheme clearance, (4) NA order. Saurabh verifies all four before listing any project — documents are shared before any payment.
Dholera SIR is the full 920 sq km planned area. The Activation City is the first 22.5 sq km that has received complete infrastructure investment — roads, grid power, water, and the ABCD Building. All SmartCityPlots-listed Dholera projects are within or immediately adjacent to the Activation City.
All cities below are personally verified by Saurabh — legal documents shared before any payment.
Current pricing · Exact plot availability · Free site visit coordination · <1 hr callback
Saurabh shares current pricing, documents, and arranges a free site visit — personally, within the hour. Documents upfront, zero pressure.