₹1.5 lakh crore in confirmed private commitments — semiconductor fabs, power plants, aerospace MRO, data centres, and industrial parks. Every MoU in one place.
Tata Electronics' ₹91,000 Cr semiconductor fab — India's first — is under active construction in Dholera. First chip production is targeted by December 2026.
India's largest semiconductor fab — Apple iPhone supply chain anchor
Semiconductor, power, aerospace, data centres, and renewable energy — Dholera is attracting investment across every strategic sector.
Vedanta and Foxconn signed a ₹1,54,000 Cr MoU in 2022 to set up India's first semiconductor plant at Dholera SIR (700 acres allotted). Foxconn withdrew from the JV in July 2023. The Dholera site remains reserved; Vedanta continues to seek an alternate technology partner.
Power infrastructure, logistics hub & data centre zone development
Executing smart city roads, utilities & trunk infrastructure works
Exclusive 24×7 power supply franchise for Dholera Activation Area
5 GW solar park — part of Asia's largest renewable energy corridor
MRO facility & aerospace manufacturing under India-Brazil defence pact
₹25,000 Cr green AI-ready 250 MW hyperscale data centre campus — MoU signed Feb 2026
All entries sourced from DSIRDA press releases, company annual reports, and verified media reports. Last reviewed May 2026.
Every ₹100 Cr of industrial commitment triggers ₹30–50 Cr in mandatory surrounding civic infrastructure — roads, power substations, water treatment, drainage. When Tata announced its semiconductor fab, DSIRDA greenlit road widening, 2,000 MW power capacity expansion, and a dedicated water supply line. That money is spent. That infrastructure cannot be moved.
Semiconductor fabs, data centres, and aerospace MROs bring thousands of permanent, high-income employees. Dholera's master plan zones residential plots adjacent to industrial zones precisely because this population migration is expected. As these facilities commission through 2026–2028, the residential demand equation changes — and plot values adjust accordingly.
For plot investors, corporate commitments create a floor. Even in a scenario where some MoUs underperform, the infrastructure already laid — the Dholera Expressway (open March 2026), the international airport (runway complete), the power grid, and the water system — is permanent. Dholera land is already improved. Entry today is at pre-commission prices.